Safran Villaroche replaces gas at its engine plant with local energy
At Villaroche, Safran’s engine plant will replace the gas used at one of its largest production sites with local, low-carbon heat drawn from a depth of 1,650 m.
- Home
- Our achievements
- Safran Aircraft Engines
CLIENT
Safran Aircraft Engines
LOCATION
Villaroche (77)
SECTOR
Industry
SOLUTION
Drilling & Works - deep geothermal energy
Geothermal doublet at the Safran Aircraft Engines site
WHAT THIS PROJECT DELIVERS
CLIENT TESTIMONIAL
“We are delighted to benefit from the proven expertise of Dalkia and Arverne in deep geothermal energy as we pursue our objective of reducing CO2 emissions from our industrial sites.
This strategic partnership fully reflects our commitment to a low-carbon industry.”
Delphine Berilloux
Director of Human and Social Responsibility, in charge of Safran Aircraft Engines sites
- Context
In Villaroche, Seine-et-Marne, Safran’s engine plant is one of the group’s main production sites, with more than 5,000 employees. Engines for Airbus, Boeing and Rafale aircraft are assembled there. To reduce the site’s carbon footprint, in line with the group’s target (−50% CO₂ emissions by 2030 vs 2018), Safran partnered with Dalkia and Arverne. The site will become the first industrial site in the Paris region (Île-de-France) with a deep geothermal plant.
- Key challenges
- Replace the gas boilers of a very large industrial site with low-carbon energy.
- Align with Safran’s roadmap: −50% CO₂ emissions by 2030 (vs 2018).
- Drill deep without disrupting a plant in continuous operation.
- Our work
Arverne is drilling a deep doublet using a new hydro-electric rig that is more compact and quieter.
- 2 wells drilled to 1,650 m into the Dogger aquifer.
- Water drawn at around 75 °C, coupled with heat pumps and an upgraded network.
- Production well completed; plant commissioning scheduled for autumn 2026.
- Results
Once commissioned, the plant will make Safran Villaroche a pioneer of industrial geothermal energy in the Paris region:
- 84% of the site’s gas replaced, over time, by local, low-carbon energy.
- 6,500 tonnes of CO₂ avoided every year once the plant is in operation.
- The first industrial site in the Paris region with a plant of this kind.
Beyond Villaroche
This project shows that an industrial site in full operation can combine performance with a smaller environmental footprint. It opens up new prospects for decarbonising industrial activities.
THE PROJECT IN PICTURES
An energy-intensive industrial site to decarbonise?
Let’s assess your site’s geothermal potential together.
Devenez actionnaire de la géothermie
Arverne développe une dizaine de projets comme celui-ci partout en France. Une augmentation de capital est ouverte aux particuliers pour accélérer leur déploiement.
KEEP EXPLORING
More Arverne achievements
Safran Aircraft Engines
Crédit Agricole Pyrénées Gascogne