Lithium de France Project: Geothermal Heat and Lithium in Alsace

Deployed by Arverne in Alsace, the Lithium de France project combines renewable heat production with lithium extraction from the geothermal water of the Rhine Graben.

Recognized by the French State as one of 150 French "industrial cathedrals," benefiting from enhanced support to accelerate its implementation, the project reached a major milestone in 2026 with the successful drilling of its first two wells at Schwabwiller The direct lithium extraction demonstrator is now operational, and an independent assessment has estimated resources at 26 million tonnes of lithium carbonate equivalent (LCE), with a total exploration potential in Alsace of up to 43 million tonnes, capable of sustaining 30 years of production and meeting the annual needs of approximately 800,000 electric vehicles. 

The Lithium de France project addresses two major challenges

Heat: still largely powered by fossil fuels

Heat accounts for nearly 50% of France's energy needs, and three-quarters of it is still produced from fossil fuels, mostly imported.

Lithium de France aims to produce 2.2 TWh of decarbonized heat for Alsace.

Lithium: a strategic resource for the energy transition

Global demand for lithium is growing rapidly, driven by the electrification of transport. Yet Europe remains 99% dependent on imports for its supply.

Lithium de France aims to produce 27,000 t/year of lithium carbonate, meeting a third of France's needs.

The benefits of the project

Sovereignty

Securing our supplies through local heat and battery-grade geothermal lithium produced in France, from extraction to refining.

Reindustrialization

Stable-priced renewable energy that strengthens economic attractiveness and competitiveness. Lithium "made in France," building a European value chain for electric mobility.
200 direct jobs and 600 indirect jobs (source: INSEE).

Decarbonization

Providing renewable, non-intermittent, decarbonized heat. Producing low-carbon lithium essential to the energy transition.

Alsace, land of energy and lithium 

The Lithium de France project transforms Alsace's underground resources into local carbon-free heat and geothermal lithium for electric batteries. This innovative industry opens up new opportunities for those who live and work in Alsace. 

Energy for the future

Lithium de France Project is developing a unique resource: naturally warm geothermal water rich in lithium. It can be used to supply to local authorities, manufacturers, and farmers local, continuous, and carbon-free heat, while producing lithium, which is essential for electric batteries. 

Deeply rooted in its territory and driven by the innovative technology of direct lithium extraction,this industry supports economic activity, strengthens energy sovereignty and opens new prospects in the fight against climate change.

The Rhine Graben is a vast valley between France and Germany, where the Earth's crust is thinner. Less deep than elsewhere, very hot water can be extracted here. This geothermal water, mixed with ancient salt water, circulates in rocks rich in lithium, which can be extracted in large quantities..

Understanding direct lithium extraction

This video shows how the demonstrator installed at Schwabwiller works, and the principle behind direct extraction of the lithium present in Alsace's geothermal water.

In Haguenau, more than 50 employees work hard every day to develop this innovative energy sector, backed by a high level of expertise in geosciences, engineering, extraction processes, the environment, and regulations.

A dynamic is taking shape around Lithium de France Project: it is generating activity, attracting skilled workers, and encouraging new businesses to set up shop. Drawing on its resources, expertise, and industrial roots, Alsace is asserting its role as a driving force in the energy transition.

The seven major stages of the project

01

Obtaining Exclusive Exploration Permits (PER)

02

Subsurface exploration campaigns

03

Drilling
operations

First doublet completed at Schwabwiller

04

Construction of the geothermal power plant

05

Construction of the heating network

06

Construction of the lithium extraction unit

07

Construction of the lithium purification unit (refinery)

Rig Alsace 43copyright_Thomas Goisque
Schwabwiller
Schwabwiller
Show filters
Rig Alsace 43copyright_Thomas Goisque
Schwabwiller
Schwabwiller

(Municipality of Betschdorf)
Two wells for geothermal heat production.
A direct lithium extraction demonstrator.

×
Geocoding Error Occured.

Tried to Geocode:

Error Type:

Please be sure to follow the tutorial on how to setup the Google APIs required for the Advanced Google Map Widget.

Google Map API Key Tutorial

Stay informed about our projects and news. Share your contact details to subscribe.