Châtenois: heating and cooling an inter-municipal sports hall with heat from the ground

To renovate COSEC Koch, its sports hall in Châtenois, the Communauté de communes de Sélestat chose geothermal energy, with support from Arverne.

CLIENT

COSEC Koch Châtenois

Communauté de communes de Sélestat

Communauté_de_communes_de_Sélestat_(logo).svg

LOCATION

Châtenois - Bas-Rhin (67)

SECTOR

Local authority

SOLUTION

Drilling & Construction – shallow geothermal energy

COSEC Koch, Châtenois: architectural rendering of the project after renovation. © Locus Architectes / bad-lab

WHAT THIS PROJECT DELIVERS

Context

Built in the 1980s, the sports hall is undergoing a comprehensive renovation (energy performance, compliance with current standards and accessibility) as part of the inter-municipal authority’s territorial climate-air-energy plan. Geothermal energy replaces the former gas heating. The inauguration is scheduled for September 2027. L’inauguration est prévue en septembre 2027.  

Key challenges

  • Replace gas heating with a renewable energy source available on site. 
  • Heat and cool a public sports facility from a single installation. 
  • Drill in the middle of a comprehensive renovation site without delaying the schedule. 

Our work

After studying several scenarios, vertical geothermal probes were chosen, and the probe field was sized together with the engineering consultancy. scénarios, la solution des sondes géothermiques verticales a été retenue ; le champ de sondes est dimensionné avec le bureau d’études

  • A test probe drilled beforehand to fine-tune the sizing. 
  • 12 vertical geothermal probes drilled to a depth of 110 m. 
  • Drilling carried out in heterogeneous ground (gravel, stones, quartz). 
  • Connection coordinated with the heating contractor, working alongside the renovation teams. 

Results

Once commissioned, scheduled for September 2027:

  • −80 % de consommation énergétique : c’est l’objectif fixé par la collectivité pour l’ensemble de la rénovation du bâtiment−80% energy consumption: this is the target set by the local authority for the renovation of the building as a whole. Geothermal energy contributes to it, alongside insulation and solar panels. 
  • The same energy source for heating in winter and cooling in summer. 
  • Renewable energy, produced on site, in place of gas.

THE PROJECT IN PICTURES

Drilling rig in action on the Châtenois site

Geothermal probes before being installed in the ground

Have a project in mind?

A building that stays comfortable in summer and winter, with energy costs under control? Let’s assess the geothermal potential of your site together.

KEEP EXPLORING

More Arverne achievements

Crédit Agricole Pyrénées Gascogne

At its headquarters site in Serres-Castet, CAPG is replacing its gas and wood-fired boilers with a system that produces heating and cooling from subsurface energy.

Galeries Lafayette

Damaged by fire in 2016, Pau’s department store will reopen at the end of 2027. A single geothermal installation will provide its heating, cooling and domestic hot water.

Safran Aircraft Engines

At Villaroche, Safran’s engine plant will replace the gas used at one of its largest production sites with local, low-carbon heat drawn from a depth of 1,650 m.